A company has 4 production sites A,B,C and D. These are to be supplied by a company-owned raw material warehouse R just-in-time. The raw material warehouse is to be planned geographically in such a way that the transport routes to the production sites are as short as possible. The following sketch shows the approximate location of the production sites.
What do I have to do to determine the optimal location of the raw material warehouse?